What This Service Entails
Stonework That Doesn’t Shift or Sink
Hardscape fails from below, so we build from below: excavated, compacted aggregate bases, bedding layers, and edge restraints before a single paver or flagstone is set. Every patio is pitched to shed water, every step is a comfortable rise, and joints are locked with polymeric sand for a finish that lasts decades.
- Excavated compacted base with geotextile separation
- Natural stone, pavers, or brick to match your home
- Drainage pitch, steps, seat walls, and fire-pit pads
- Sealed, sand-locked joints with a workmanship warranty

What’s Included
Built Like It Should Be
Patios & Terraces
Entertaining space sized for your furniture and guests, with patterns and borders that suit the house.
Walkways & Steps
Safe, level routes from drive to door and through the garden — lit, drained, and slip-conscious.
Walls & Edging
Seat walls, garden edging, and small retaining walls that give beds structure and hold grades.
Stonework Gallery
Hardscape We’ve Set in Stone
Patios, paths, and steps across the service area.
See a Walkway Project
FAQs
Hardscape Questions
How long does a patio take?+
Most patios and walkways take three to seven working days, depending on size, access, and weather.
Will pavers sink or shift?+
Not on our base: compacted aggregate, edge restraint, and locked joints keep everything level for years.
Stone or pavers — which is better?+
Both last when installed right. We’ll compare look, cost, and maintenance for your specific project.